土木工程毕业设计《摘要》案例一篇,仅供参考
发布日期:2020-02-02 11:12:47发布:土木工程网推荐:土木龙
导读:
本设计是南宁市某县培训楼工程,结构形式采用钢筋混凝土框架结构。设计内容包括结构设计和施工组织设计两大内容。在结构设计部分首先进行结构选型,然后根据建筑要求及结构形式进行结构布置,手算部分:现浇板的计算按弹性理论方法计算;手算一榀框架的内力及其内力组合并配筋;楼梯按板式楼梯设计,对一部分梯段板、平台梁和平台板配筋进行内力计算及配筋;基础按独立基础进行设计。
摘 要
[摘要]:本设计是南宁市某县培训楼工程,结构形式采用钢筋混凝土框架结构。设计内容包括结构设计和施工组织设计两大内容。在结构设计部分首先进行结构选型, 然后根据建筑要求及结构形式进行结构布置,手算部分:现浇板的计算按弹性理论方法计算; 手算一榀框架的内力及其内力组合并配筋;楼梯按板式楼梯设计, 对一部分梯段板、平台梁和平台板配筋进行内力计算及配筋;基础按独立基础进行设计。
[关键词]:钢筋混凝土,框架结构
[Abstract]: This design is a training building in the city of NanNing, construction form adoption reinforced concrete frame construction. Designing the contents includes the construction the design with starts construction to organize design two inner palaces permit. In construction design part first proceed construction chose type, then according to building request and construction form proceed construction arrange, calculate part: now sprinkle knothole calculation press flexibility theories method calculation; first stalk frame made use of mechanics beg solve machine proceeding the dint computes, again inside dint combination and go together with the reinforcing bar; the stairs presses plank type stairs to design, to a the peaceful bedplate in beam in a plank, terrace in part of stepses goes together with the reinforcing bar proceeds inside dint calculation and go together with the reinforcing bar; the foundation proceeds the design according to the independent foundation; The construction organizes design the part computes the amount of engineering first, proceeding and then the labor and material analyzes, starting construction to deploy, choosing the construction project, certain construction the degree of progress plans, to construction the spot proceed the flat surface arranges, working well each item guarantee the measure.
[Key words]: Reinforced concrete,Frame construction,The construction organizes
Construction project,Construction flat surface design
声明:我站尊重原创,转载出于让更多的人了解和学习建筑,局部有所改动,能找到作者与出处我均有标明;如因版权等原因,请与我联系删除!